Boiler Distribution Pipe Sizing

Hydronic GPM = Q / (500 × delta-T), the smallest copper / steel / PEX size at or below the velocity ceiling, velocity.

Run the calculator

Example

You enter

You get

Details, formula, and sources

Hazen-Williams head loss per 100 ft, and pump head at the run length. Per ASHRAE Systems and Equipment 2020 Ch. 13.

GPM = Q / (500 × delta-T) (hydronic water energy balance). Velocity (ft/s) = GPM / (2.448 × d_in²). The smallest standard inner diameter whose velocity is at or below the ceiling is recommended. Head loss = Hazen-Williams (C = 150 copper/PEX, 130 steel); pump head = head per 100 ft × run length / 100.

ASHRAE Systems and Equipment 2020 Chapter 13 (hydronic heating) by name; Bell & Gossett / Taco system-design velocity limits by name. Hazen-Williams (1905) public domain.

ASHRAE Handbook TOC free at ashrae.org; B&G / Taco design guides free at bellgossett.com / tacocomfort.com.

Estimate. AHJ and licensed mechanical contractor govern. ACCA Manual J / D / S supersede rules of thumb.

Field names used by the API: boiler_btu_hr, delta_T_F, material, max_velocity_fps, length_ft, gpm, velocity_fps, friction_ft_per_100ft, head_ft