Also in: Disaster Response and Recovery

Dock Door Count from Arrivals and Turn Time

Converts trucks and turn time into door-hours and a door count at a practical utilisation.

Run the calculator

Example

You enter

You get

Checked against published worked examples from: 4Front Engineered Solutions (Kelley); W.B. McGuire (a division of Systems, LLC).

Details, formula, and sources

Scopeon the daily average and again over the peak window. The worked dock needs 12 doors for the peak against 9 on the average, and 15 minutes of turn time saves 3 doors.

Formula or tableDoor-hours = trucks x turn time; doors at full utilisation = door-hours / operating hours; doors required = that count / practical utilisation, rounded up; the peak is computed the same way over the peak window.

Source and editionThe facility's own arrival data, turn-time measurement, and yard and detention practice.

Free accessQueueing arithmetic only; no purchased standard is required to reproduce it.

What governsEstimate. AHJ and licensed professional govern.

API field namestrucks_per_day, operating_hours, turn_time_min, utilization_pct, peak_arrival_share_pct, peak_window_hours, improved_turn_time_min, door_hours, doors_at_full_utilization, doors_required, peak_trucks, peak_door_hours, peak_doors_required, peak_shortfall_doors, improved_peak_doors_required, doors_saved_by_turn_time

Related tools