Galvanized Duct Sheet-Metal Weight Takeoff

Duct sheet-metal weight from the perimeter, run, and gauge - the number that sizes the coil order and the hangers.

Run the calculator

Example

You enter

You get

Details, formula, and sources

perimeter = 2 x (width + height); weight = perimeter x length x sheet weight x seam factor. A 24 x 12 in run, 100 ft long in 24-gauge galvanized, is about 798 lb once the SMACNA seam-and-reinforcement allowance is counted; a heavier 20-gauge run is over 1,140 lb. The gauge schedule is the lever; fittings are taken off separately.

perimeter_ft = 2 x (width_in + height_in) / 12; area_sf = perimeter_ft x length_ft; weight_lb = area_sf x lb_per_sf x seam_factor.

Duct sheet-metal weight identity by name (developed area x per-gauge sheet weight x seam allowance); first-principles takeoff arithmetic.

The developed-area geometry is public first-principles; the per-gauge sheet weight is entered from the metal (no copyrighted table reproduced).

Estimate. AHJ and licensed professional govern.

Field names used by the API: width_in, height_in, length_ft, lb_per_sf, seam_factor, perimeter_ft, area_sf, weight_lb