Excavation Slope and Bench-Step Plan

OSHA Appendix B slope ratios A 0.75:1 / B 1:1 / C 1.5:1 turned into spoil volume (yd^3), surface footprint.

Run the calculator

Example

You enter

You get

Details, formula, and sources

OSHA Appendix B slope ratios A 0.75:1 / B 1:1 / C 1.5:1 turned into spoil volume (yd^3), surface footprint, and bench-step layout. Competent person on-site governs the final plan.

horizontal_offset = depth * ratio (A 0.75 / B 1.0 / C 1.5). top_width = bottom_width + 2 * offset. cross_section = (top + bottom) / 2 * depth. volume_yd3 = cross_section * length / 27. Bench layout (A/B): 4 ft per bench; horizontal_step = bench_height * ratio.

OSHA 29 CFR 1926 Subpart P Appendix B and §1926.652.

ecfr.gov.

Math aid for personal verification. Stop work and consult the qualified person on site if any number does not match the field condition.

Field names used by the API: depth_ft, soil_class, surcharge, length_ft, bottom_width_ft, top_width_ft, spoil_volume_yd3, footprint_ft2