Grease Trap Sizing
Volume from peak flow, retention, and loading factor; PDI G101 cited.
Example
You enter
- Peak fixture flow (gpm) 50
- Retention time (min) 30
- Loading factor 1.25
You get
- Required volume 1875 gal
- Recommended nominal 2000 gal
Details, formula, and sources
Volume = peak GPM × retention time × loading factor. Recommended nominal sizes follow PDI G101 step ladder. IPC 2021 Section 1003 governs interceptor selection.
PDI G101 by name; IPC 2021 (International Plumbing Code). Section 1003.
Free read-only access at codes.iccsafe.org. PDI G101 licensed; manufacturer (Schier, Thermaco, Rockford) sizing tools free.
Estimate. AHJ and licensed plumber / gas fitter govern. Verify against the IPC / IFGC edition adopted in your jurisdiction.
Field names used by the API: peak_flow_gpm, retention_minutes, loading_factor, volume_gal, recommended_nominal_gal
- Retention time 30 min unless user suppliesPDI G101 by name
- Loading factor 1.0 unless user supplies adjustment for high-grease useengineering practice