Motor Run Hours for an Energy Budget

The run hours an annual energy budget buys.

Run the calculator

Example

You enter

You get

Details, formula, and sources

hours = budget / (input_kW x rate), input_kW = HP x 0.746 x load / efficiency. A 25 HP motor at 93% and $0.12/kWh draws 20.05 kW, so a $5,000 budget covers about 2,078 hours. Answers 'how long can I run it' instead of the cost from a set duty. Energy charge only; the utility tariff (demand, time-of-use, power-factor) governs the full bill, so the real hours are fewer.

input_kW = HP x 0.746 x (load_factor/100) / (efficiency/100); max_hours = cost_budget / (input_kW x rate); annual_kWh = input_kW x max_hours. The inverse of annual_cost = input_kW x run_hours x rate.

First-principles electrical-input power and the 0.746 kW-per-HP identity, solved for the run hours.

First-principles physics; no licensed source required.

Estimate. AHJ and licensed professional govern.

Field names used by the API: hp, efficiency_pct, load_factor_pct, rate_usd_per_kwh, cost_budget_usd, input_kw, max_hours_per_year

Related tools