Concrete per Post Hole

The concrete a batch of post holes needs.

Run the calculator

Example

You enter

You get

Details, formula, and sources

The cylinder volume of each hole less the post's displacement, totaled and divided into bags. For a fence, deck, sign, or mailbox.

Per hole = pi x (dia/2)^2 x depth / 1728 - post_side^2 x depth / 1728; total = per hole x posts; bags = ceil(total cu ft / bag yield).

Cylinder-volume geometry less post displacement; bagged-concrete yields ~0.45 cu ft (60-lb) / 0.60 cu ft (80-lb).

Bag yields free on the concrete-bag label.

Estimate. AHJ and licensed professional govern.

Field names used by the API: num_posts, hole_diameter_in, hole_depth_in, post_side_in, bag_yield_cuft, concrete_each_cuft, total_cuft, bags

Related tools