Water-Supply Pressure Budget

Available residual at the critical fixture after elevation, meter, backflow, and friction losses.

Run the calculator

Example

You enter

You get

Details, formula, and sources

Available residual at the critical fixture after elevation, meter, backflow, and friction losses, with a go/no-go verdict.

elevation_loss = fixture_height * 0.433; available = street_pressure - elevation_loss - meter_loss - bfp_loss - friction_loss; headroom = available - fixture_min; adequate = headroom >= 0. 0.433 psi per foot of water column.

IPC 2021 Section 604 and the ASPE Plumbing Engineering Design Handbook Vol. 2 by name; first-principles pressure budget.

IPC 2021 free read-only at codes.iccsafe.org; the 0.433 psi/ft water-column constant is public.

Estimate. AHJ and licensed professional govern.

Field names used by the API: street_pressure, fixture_height, meter_loss, friction_loss, fixture_min, elevation_loss, available, headroom

Related tools