Evaporator Design TD and Humidity Band

DTD = box temp - saturated suction, which sets the box humidity: <=10 F ~90% RH (produce), 12-16 F ~75-80% (meat), >16 F <70% (frozen). A 35 F box on a 25 F SST -> 10 F TD, ~90% RH; a drying 17 F suction -> 18 F TD, <70% RH. A smaller TD needs more coil. The coil rating at the design TD governs.

Run the calculator

Formula and source

DTD = box_temp - saturated_suction_temp; humidity band by DTD (<=10 F ~90% RH ... >16 F <70% RH).

The evaporator design temperature difference (DTD) and the resulting box-humidity bands, from refrigeration coil-selection practice, by name.

Audience

This tile is built for trades and the adjacent professions in the HVAC group. The interactive calculator runs entirely in your browser. No account, no fee, no advertising, no tracking.

Related tools

Posture

Rough Logic answers the math question the working professional asks on the job. The site is a calm, fast, ad-free, account-free, ever-free reference. It does not interpret code. It does not replace the licensed professional. It does not store your inputs. The Authority Having Jurisdiction governs all installations and inspections.