Material Drying Times

Typical drying times by material and contamination.

Run the calculator

Formula and source

(reference page; no compute) Typical drying-time benchmarks for common building materials (drywall 2-3 days, hardwood 4-7 days, carpet pad 1-2 days, plaster 5-10 days, etc.) based on engineering-practice observations and original plain-English notes.

IICRC S500-2021 by name; original plain-English notes by the project author.

Audience

This tile is built for restoration and the adjacent professions in the Water Damage and Mold Restoration group. The interactive calculator runs entirely in your browser. No account, no fee, no advertising, no tracking.

Related tools

Posture

Rough Logic answers the math question the working professional asks on the job. The site is a calm, fast, ad-free, account-free, ever-free reference. It does not interpret code. It does not replace the licensed professional. It does not store your inputs. The Authority Having Jurisdiction governs all installations and inspections.