Light-Gauge Steel Stud and Track Takeoff

Light-gauge steel studs and track for a partition.

Run the calculator

Example

You enter

You get

Details, formula, and sources

studs = ceil(wall / spacing) + 1 + openings x extra; track = 2 x wall (top and bottom runners). A 50 ft partition at 16 in on center with two door openings is 43 studs and 100 LF of track; at 24 in on center the field studs drop and it is 30 studs on the same 100 LF. The spacing sets the field count, the openings add on top. Distinct from the wood residential-framing.

studs = ceil(wall_length_ft / (spacing_in/12)) + 1 + openings x extra_per_opening; track_lf = 2 x wall_length_ft.

Steel stud/track takeoff identity by name (field studs from wall over spacing, plus one and the opening allowance; track twice the wall); first-principles count arithmetic.

The takeoff is public quantity arithmetic; the spacing and opening details come from the plans.

Estimate. AHJ and licensed professional govern.

Field names used by the API: wall_length_ft, spacing_in, openings, extra_per_opening, studs, track_lf

Related tools